Prioritize inspection planning
A Risk Based Inspection (RBI) approach allows the operator to prioritize the inspection plan based on the prediction of failure versus the traditional time-based or condition based inspection plan.
Understand deterioration mechanisms
By understanding the effects of deterioration mechanisms, either due to time, process, or environmental impacts, the RBI approach helps identify the risk prior to meeting an unacceptable level and allow owner/operators to react and mitigate prior to reaching unacceptable events such as thru-wall failure.
Remove data silos
Consolidate the software functions and data to address the various layers into a single platform of the SAP Intelligent Asset Management (IAM) suite. A single platform allows the operators to have a consolidated view of the physical and virtual assets designed to address a Loss of Containment. Thi More